Engineering Fees
|
PLANNING AND DEVELOPMENT SERVICES |
FEES |
|
ENGINEERING SECTION |
All fees are exclusive of GST |
|
Engineering Review Inspection and Administration of Subdivisions* |
Value of Municipal Works ** (Town of Ajax and Region of Durham)
<$500,000 - 4.5% $500,000 - $1 million - 4.0% >$1 million - 3.5% |
|
Landscape Architectural and Environmental Services Review and Inspection * |
4.5% of value of Landscape Works |
|
Peer Reviews |
Actual Costs |
|
Pre-Servicing Agreement |
$1,500 each application |
|
Benchmarks |
$750 per 200 lots, minimum $750 |
|
Digital Drawing Management Fee |
Value of Municipal Works ** (Town of Ajax and Region of Durham)
<$100,000 - $300 $100,000 - $500,000 - $500 > $500,000 - $1,000 |
|
Stormwater Maintenance Fee |
$2,000 per hectare |
|
Municipal Consents |
$350 each application |
|
Design Criteria |
CD only $25.00 Book and CD $80.00 |
|
Benchmark Data |
$10.00 |
| Site Plan |
Value of Works for: Multi-family/Residential/ Commercial/Industrial/Institutional (excludes site servicing permit construction value)
<$500,000 - 4.5% $500,000 - $1 million - 4% >$1 million - 3.5% or $1 million (whichever is greater)
Model homes - $500 per application Sales Trailer - $500 per application Single Family - $500 per application |
|
Site Inspections for Site Plan Applications |
$200 per inspection for 3rd inspection or more |
|
Hourly Rates |
Engineer - $85.00/hour Engineering Technician - $55.00/hour Landscape Architect - $85.00/hour |
| Driveway Widening |
$100 per application (This fee may be credited toward a minor variance application if it is determined that relief from the zoning by-law is required.) |
| Sedimentation and Erosion Control Permit |
$500 (plus $100 per hectare); $500 for the renewal of a permit |
|
Road Occupany Permit |
$50 per application |
* If there are unusual engineering and/or construction circumstances, poor construction techniques and/or inadequate inspection by the consultants; upon notification, the applicant will be charged the applicable hourly rates in addition to the initial percentage fee. This Schedule is for routine (typical) transactions, based on three design submissions per application. Additional hourly fees may be charged at the discretion of the Director of Planning and Development or Director of Operations and Environmental Services, as applicable.
** Value of Municipal Works to be assumed by the Town of Ajax and Region of Durham including Engineering and Contingency Fees.
|