 |
Basement Walkouts
- The estimated construction value (to be checked against the TACBOC valuation)
- A completed Building Permit application form
- The Building Permit Fee pursuant to Building Bylaw 29-97, Schedule A, Part B, item 12
- Four copies of the SITE PLAN/SURVEY showing the proposed location of the structure with dimensions of the structure and to all property lines.
- Four copies of CONSTRUCTION DRAWINGS including:
- cover page or title block
- fully dimensioned floor plan
- fully dimensioned cross section through basement walkout
- north arrow, scale, legend of symbols, the project identity (name, address, unit #, etc.)
- A completed Durham Region Health Department Application if the subject building is adjacent to a Septic System.
|