Townhall
 

New Residential Housing (Sub-division)

  • A signed and dated Declaration Form to indicate that no design changes have been made if the application is for the approval of a previously reviewed model
  • The estimated construction value (to be checked against the TACBOC valuation)
  • A completed Building Permit application form
  • The Building Permit Fee pursuant to Building Bylaw 29-97, Schedule A, Part B, item 3
  • Six copies of the SITE PLAN/GRADING PLAN (Reviewed/Approved by the Control Architect & Engineer) (include UNPROTECTED OPENINGS)
  • Two copies of fully dimensioned CONSTRUCTION DRAWINGS including:
    • a cover page or title block indicating the review/approval by the Control Architect
    • the size of the proposed building
    • north arrow, scale, legend of symbols
    • the project identity (name, address, unit #, etc.)
    • the nature of the occupancy (i.e. S.F.D., Townhouse)
  • Two copies of the ROOF TRUSS drawings (to be approved by an engineer)
  • Two copies of HEAT LOSS calculations and DUCT LAYOUT
  • The builders O.N.H.W.P. registered number or a signed O.N.H.W.P. declaration if the owner is constructing the building for personal occupancy
  • Completed Regional Municipality of Durham Residential Development Charges Information Form(s) - Regular and Carruthers Creek (when necessary), for each unit
  • A completed Education Development Charges Information Form (for each unit)
  • A completed Town of Ajax Development Charges Form (for each unit)
  • A copy of the Regional Municipality of Durham Regional Application for Sanitary Sewer/Water Service hook-up, or a private sewer and potable water approval from the Durham Regional Health Service
  • A completed Other Approvals Form (where necessary)
  • A Soils Report verifying the adequate bearing capacity and the permanent ground water level
  • A completed Durham Region Health Department Application if the subject building is connected to or adjacent to a Septic System